<?xml version="1.0" encoding="UTF-8"?><metadata xml:lang="en">
<Esri>
<CreaDate>20231129</CreaDate>
<CreaTime>18262200</CreaTime>
<ArcGISFormat>1.0</ArcGISFormat>
<SyncOnce>TRUE</SyncOnce>
</Esri>
<dataIdInfo>
<idCitation>
<resTitle>State Planning Policy 2.1 Peel-Harvey Coastal Plain Catchment (DPLH-049)</resTitle>
</idCitation>
<idAbs>The Peel-Harvey coastal plain catchment policy ensures that land use changes within the Peel-Harvey estuarine system likely to cause environmental damage to the estuary are brought under planning control and prevented.
The objectives of this policy are to:
- Improve the social, economic, ecological, aesthetic, and recreational potential of the Peel-Harvey coastal plain catchment. - Ensure that changes to land use within the catchment to the Peel-Harvey estuarine system are controlled so as to avoid and minimise environmental damage. - Balance environmental protection with the economic viability of the primary sector. - Increase high water-using vegetation cover within the Peel-Harvey coastal plain catchment. - Reflect the environmental objectives in the draft Environmental Protection Policy (Peel-Harvey Estuarine System) 1992. - Prevent land uses likely to result in excessive nutrient export into the drainage system.
License: Creative Commons Attribution
Contact: spatialdata@dplh.wa.gov.au</idAbs>
<idCredit>
</idCredit>
</dataIdInfo>
</metadata>
